[1]
Refia Alaida et al. 2025. Analisis Non-Physical Waste (Waiting) pada Pelaksanaan Proyek Bangunan Gedung di PT. X Menggunakan Lean Construction Tools. Jejak digital: Jurnal Ilmiah Multidisiplin. 1, 5 (Aug. 2025), 3074–3083. DOI:https://doi.org/10.63822/zfgy9489.